IPC Commissioning Planning Engineer - Nuclear in Bridgwater

IPC Commissioning Planning Engineer - Nuclear in Bridgwater

Bridgwater Full-Time 45000 - 55000 £ / year (est.) On-site
Wood

At a Glance

  • Tasks: Manage project schedules and support planning activities for a groundbreaking nuclear project.
  • Company: Join Wood, a global leader in engineering and consulting for energy and materials.
  • Benefits: Enjoy a competitive salary, flexible working hours, and opportunities for professional growth.
  • Other info: Work in a dynamic environment with a focus on teamwork, transparency, and innovation.
  • Why this job: Be part of a pioneering nuclear project that shapes the future of energy in the UK.
  • Qualifications: Degree in Engineering or related field; experience in project management or controls is a plus.

The predicted salary is between 45000 - 55000 £ per year.

Wood Commissioning is recruiting for an experienced IPC Commissioning Planning Engineer to support EDF at Hinkley Point C (HPC). Ideally based locally to the area, successful candidates will be engaged on a 12 month rolling PAYE contract working 40 hrs/week Monday to Friday at the HPC Site in Bridgwater.

The Role

Working in the Central Controls Teams as part of the Planning Discipline of Project Controls, under the direction and leadership of the IPC Planning Manager, to be responsible for the management of the Level 2/4 (client) Integrated Work Schedule (IWS) in adherence with HPC processes. This will include managing the alignment of Level 3 (contract) schedules, and provision of time-related data and analysis. To support the IPC Planning Manager in leading central Planning activities for the Project and in developing Planning standards, policies and strategies. To support EDF Energy in making informed decisions to support the efficient and timely delivery of work scope. It is the overarching objective of the Integrated Project Controls (IPC) Function to act as a centre of excellence.

Operating Environment

In order to understand the operating environment, the job-holder will be familiar with the following key documents:

  • Company Manual – outlines the purpose of the company
  • Project Execution & Business Plan – describes the delivery strategy for the Project
  • Project Delivery Model – signposts readers to key procedures
  • Integrated Project Controls Manual – how work is undertaken in the Integrated Project Controls Function
  • Discipline-specific Procedures – detailed activity steps, interfaces, etc.

The Nuclear environment is highly regulated by the Office for Nuclear Regulation (ONR). Nuclear Safety Culture is of paramount importance to the Project and embedded throughout.

Challenges and Problem Solving

  • Ensure alignment of data between Planning and other Disciplines of Integrated Project Controls
  • Manage schedule changes within the Programmes
  • Work with key interfaces to identify and understand issues and concerns
  • Collaboratively resolve issues, implement corrective action or escalate as required

Decision-Making

The jobholder will be responsible for Project data within their area of work and will have authority to make decisions relating to the maintenance of the data. The jobholder’s line manager will be accountable for the data and material decisions will be referred upwards accordingly.

Responsibilities

Key responsibilities will include:

  • Support the IPC Lead Planner in the implementation and maintenance of Project Controls processes for Planning
  • Support Senior Project/ Programme Managers including the production of monthly reports, through the provision of intelligent information and analysis
  • Collaborate with other Disciplines of Integrated Project Controls, as well as other Project Support Functions, to help deliver Project goals in keeping with the HPC principles of Trust, Transparency and Teamwork
  • Produce and maintain the schedule baseline IWS in Primavera 6 (P6), with fully logic-linked work plans aligned to the Work Breakdown Structures (WBS) and utilising approved construction techniques
  • Ensure the Level 2/4 IWS is updated to an agreed timeframe
  • Assist in the Trend & Change process, including analysis at Project level, generating performance indicators and providing feedback on areas of risk and opportunities
  • Identify, analyse and provide solutions to time-related issues
  • Co-ordinate, verify and produce Project-level schedule reports to a defined reporting cycle, including commentary on key time-related drivers and performance issues
  • Adhere to Project governance and Scheduling standards and procedures
  • Ensure all Project documents, in particular Sensitive Nuclear Information, are correctly protectively marked, and protected in accordance with EDF policies and procedures

Functional Management

  • Accountable for the adherence of direct reports to Project governance and standards
  • Proactively seek to continuously improve Discipline performance by implementing best practice and learning
  • Facilitate collaboration with Programme teams and wider industry partners to ensure consistency and transparency in approach and data
  • Take necessary care to ensure that direct reports properly protect the confidentiality, integrity and availability of corporate information from unauthorised disclosure, modification or destruction
  • Support the recruitment process for the Discipline
  • Act as a role model for HPC Project and EDF Energy by exhibiting and encouraging behaviours which are in alignment with the Project's values of Humility, Positivity, Clarity, Respect and Solidarity

Qualifications

What makes you remarkable?

  • Minimum of a degree in Engineering, Construction or other related field, or HND or equivalent qualification with recognised experience commensurate with a degree
  • Professionally qualified with chartered or equivalent status
  • Proven relevant experience in a Project Management or Project Controls environment in a similar Scheduling role on a major construction project
  • Substantial experience in the use of scheduling software, ideally Primavera P6 version 7 and above
  • Experience of commercial contracting
  • Detailed understanding of scheduling methodologies and techniques
  • Technical and practical comprehension of engineering, procurement and construction methods and techniques in a UK context
  • Ability to produce accurate, complete and fully logic-linked construction plans
  • Understanding of other Disciplines of Project Controls (particularly Estimating, Cost and Risk) including management techniques and associated software
  • Understanding of earned value analysis
  • Understanding of various contract types, in particular the NEC suite and FIDIC
  • Working knowledge of schedule risk analysis techniques
  • Good commercial awareness
  • High level of analytical and numerical skills and good attention to detail
  • Excellent written and verbal communication skills at all working and management levels

The job-holder will be expected to have a working level of knowledge of, and to use, the following (or similar equivalent) software tools:

  • Primavera P6 (Scheduling)
  • Synchro (4D modelling)
  • Acumen Fuse (Schedule Analysis)
  • Microsoft Office software (Excel, Word, PowerPoint, Access)
  • Teamcenter (Document Control)

Desirable:

  • Experience of developing estimates and budgets for major infrastructure programmes
  • Experience of working in a large integrated team over the full lifecycle of a project
  • Experience in presenting complex information to senior executives and shareholders
  • Experience in the Nuclear sector
  • Influencing skills
  • Ability to build relationships with Project stakeholders, and to act on behalf of the Programme Team as their representative

Wood is a global leader in consulting, engineering and operations for the energy and materials sectors. With 33,000 people in around 50 countries, Wood supports clients across the full asset lifecycle, delivering safe, predictable outcomes while enabling resilient operations and a lower carbon future. Wood forms the Energy & Materials pillar of Sidara - a global partnership uniting leading multidisciplinary engineering, design, and project management companies.

Diversity Statement

We are an equal opportunity employer that recognises the value of a diverse workforce. All suitably qualified applicants will receive consideration for employment on the basis of objective criteria and without regard to race, colour, age, religion, gender, national origin, disability, sexual orientation, gender identity, protected veteran status, or other characteristics in accordance with the relevant governing laws.

IPC Commissioning Planning Engineer - Nuclear in Bridgwater employer: Wood

Wood is an excellent employer, offering a dynamic work culture that prioritises safety and reliability while providing hands-on experience in mechanical systems. With a commitment to employee growth and development, team members benefit from a supportive environment and opportunities to advance their careers within a global consulting and engineering firm. Located in the United Kingdom, employees enjoy a balanced 2/3 rota schedule, allowing for both professional fulfilment and personal time.

Wood

Contact Details:

Wood Recruitment Team

StudySmarter Expert Advice🤫

We think this is how you could land IPC Commissioning Planning Engineer - Nuclear in Bridgwater

✨Join Engineering Meetups!

Get yourself along to local engineering meetups or tech conferences. These are great places to connect with like-minded folks and industry leaders who might just have a lead on that full-time IPC Commissioning Planning Engineer - Nuclear role you’re after at Wood.

✨Show Off Your Projects!

Don’t be shy about showcasing your engineering projects. Whether it’s a funky app, a mechanical design, or a complex algorithm, having a solid portfolio on platforms like GitHub can really make you stand out. Plus, it gives potential employers at Wood a taste of what you can bring to the table!

✨Engage with Online Communities

Dive into engineering forums and online communities, like Reddit or specific engineering Discord channels. Sharing your insights, asking questions, and being active can help you build connections that might lead to job opportunities at Wood.

✨Apply Through Company Websites

When you spot a role like IPC Commissioning Planning Engineer - Nuclear at Wood, apply directly through their website. Often, this can show your genuine interest in the company and you might just get noticed quicker than via typical job boards.

We think you need these skills to ace IPC Commissioning Planning Engineer - Nuclear in Bridgwater

Project Controls
Integrated Work Schedule (IWS)
Primavera P6
Scheduling Methodologies
Data Analysis
Communication Skills
Problem-Solving Skills

Some tips for your application 🫡

Showcase Your Technical Expertise:When applying for an engineering role like IPC Commissioning Planning Engineer - Nuclear, it’s essential to highlight your technical skills. Include any relevant software or tools you're proficient in on your CV—think CAD software, simulation tools, or programming languages. Don't skimp on any engineering projects you've worked on that demonstrate your ability to solve complex problems.

Focus on Results and Impact:In the engineering world, we love numbers and real-world impact. Quantify your achievements wherever possible—like reducing costs by a certain percentage, improving efficiency, or successfully completing a project ahead of schedule. This gives your future employers at Wood a clear picture of the value you can bring.

Craft a Compelling Cover Letter:Use your cover letter to express your passion for engineering and explain why you’re drawn to Wood specifically. Share what aspects of their work excite you and how your values align with theirs. This is your chance to show a bit of personality while keeping it professional!

Include Relevant Certifications:If you have any engineering certifications, especially ones that are recognised in your field, make sure to feature them prominently on your CV. They demonstrate not just your knowledge, but also your commitment to professional development, which is something we at StudySmarter value highly.

How to prepare for a job interview at Wood

✨Brush Up on Core Engineering Principles

Before heading into the interview with Wood, make sure you're solid on the fundamental engineering principles relevant to the role. Be ready to discuss concepts such as thermodynamics, fluid mechanics, or structural analysis, depending on the specifics mentioned in the job description. Don’t skip any hands-on projects or coursework; these can be excellent talking points!

✨Show Off Your Problem-Solving Skills

Expect technical questions or case studies during your interview—after all, engineering is all about solving problems! Prepare a few examples of how you've tackled engineering challenges in the past, whether at university or in any practical experience. Practising with mock technical interviews can really help you articulate your thought process and solutions.

✨Relate Your Experience to the Role

In a full-time role, employers like Wood want to see that you can adapt and grow within their team. Be ready to discuss how your previous internships, projects, or studies relate directly to the work you'll be doing. Highlight specific experiences that showcase your collaborative skills and how you've successfully worked within a team environment.

✨Know Your Tools and Software

Most engineering roles require familiarity with specific tools and software. Prepare to talk about your proficiency with programmes like AutoCAD, MATLAB, or SolidWorks if they’re relevant to the role. Even better, have examples of projects where you’ve used these tools, as it'll demonstrate your hands-on experience and readiness for the job.