Offshore Windfarm Installation Engineer (3rd) – Shipboard

Offshore Windfarm Installation Engineer (3rd) – Shipboard

Full-Time On-site
V

V.Group seeks a 3rd Engineer for Windfarm Installation Unit to support shipboard operations. The role is a contract assignment on windfarm installation vessels, situated in UK waters. The engineer must hold WTIV/Jack-up offshore experience and relevant safety certificates to operate on board with a disciplined approach to offshore routines.

Joining date is 16 December 2026, with a 3-week window (+/- 1 week). The position requires UK location and shipboard duty, reporting to the Engine Department.

#J-18808-Ljbffr

Offshore Windfarm Installation Engineer (3rd) – Shipboard employer: V.Group

At V., we pride ourselves on being an exceptional employer, offering a dynamic work environment that fosters collaboration and innovation. Our commitment to employee growth is evident through our investment in talent development, ensuring that every team member has the opportunity to thrive in their career. Located in a vibrant industry hub, our culture is built on our core values of care, consistency, and commitment, making V. a rewarding place to work for those passionate about making a difference in the marine services sector.

V

Contact Details:

V.Group Recruitment Team