SAP Environments Manager
Scroll down to find the complete details of the job offer, including experience required and associated duties and tasks.
Initial 3 month contract
Outside IR35
Hybrid - 3 days per week working from home, 2 days per week in the office
Overall purpose of the role
The Environments Manager gives SAP Futures a single owner for its non-production and production landscape. Today environment decisions are spread across the programme, Basis, NTT DATA and BAU teams, with no agreed strategy, booking process or refresh plan.
The programme is moving from ECC and SAP Process Orchestration (PO) to SuccessFactors, Concur and S/4HANA, with SAP Integration Suite on BTP as the target middleware and SAP IAS/IPS for identity. Programme build, testing, training and BAU support all need the same environments at the same time.
The role defines the SAP Futures Environment Strategy & Roadmap, runs the environments day to day, and makes sure every test phase, training event and release has a ready, connected and correctly configured environment when it needs one.
Main duties and responsibilities
1. Environment baseline and landscape map
Build one current-state map of every SAP Futures environment: ECC, PO, Gateway, SuccessFactors instances, Concur, BTP and Integration Suite tenants, IAS/IPS and Content Server.
Record for each environment: purpose, system and client, version, owner, users, connected systems, data currency and current usage (programme, BAU or both).
Identify gaps, conflicts and single points of failure, including environments shared between programme and BAU.
2. SAP Futures Environment Strategy & Roadmap
Define the target environment landscape across DEV, SIT, UAT, training, regression and production for each product.
Set out how environments connect: integration and connectivity paths, identity and authentication (IAS/IPS, SSO), and which non-production systems talk to each other.
Define ownership, BAU versus programme usage, provisioning lead times and the Concur Phase 2 environment needs.
Plan the transition-state landscape for the future S/4HANA conversion, including which ECC and PO environments must stay until then.
Take the strategy through the Technical Review Board for sign-off.
3. Environment operating model
Set up an environment booking and scheduling process so test phases, training and BAU fixes do not clash.
Define the data refresh and test data approach for each environment, covering refresh frequency, anonymisation and GDPR requirements.
Agree transport and release management rules across ECC, SuccessFactors, Concur and Integration Suite, aligned with CAB.
Define environment entry and exit criteria for each test phase.
4. Environment readiness for delivery
Produce and maintain an environment plan aligned with the programme plan, showing when each environment is needed, by whom, and in what state. xsabvtc
Coordinate builds, refreshes and configuration changes with Basis, NTT DATA and SAP so environments are ready before each test phase and training event.
Run environm...
SAP Environments Manager in Belgrave employer: Morson Edge
As a leading player in the Energy Sector, our company offers an exceptional work environment in Bridgwater, Somerset, where you can thrive as a Welding / NDT Field Engineer. We pride ourselves on fostering a collaborative culture that prioritises employee growth and development, alongside competitive daily rates and the potential for contract extensions until December 2026. Join us to be part of a dynamic team dedicated to making a meaningful impact in the energy industry.