IPC Commissioning Planning Engineer - Nuclear in Bridgwater

IPC Commissioning Planning Engineer - Nuclear in Bridgwater

Bridgwater Full-Time 48600 - 59400 £ / year (est.) On-site
John Wood Group PLC

At a Glance

  • Tasks: Manage project schedules and support planning activities for a groundbreaking nuclear project.
  • Company: Join Wood, a global leader in engineering and consulting for energy and materials.
  • Benefits: Enjoy competitive pay, professional growth, and a chance to work on innovative projects.
  • Other info: Collaborative environment with opportunities for career advancement and skill development.
  • Why this job: Be part of a transformative nuclear project that shapes the future of energy.
  • Qualifications: Degree in Engineering or related field; experience in project management or controls preferred.

The predicted salary is between 48600 - 59400 £ per year.

Wood Commissioning is recruiting for an experienced IPC Commissioning Planning Engineer to support EDF at Hinkley Point C (HPC). Ideally based locally to the area, successful candidates will be engaged on a 12 month rolling PAYE contract working 40 hrs/week Monday to Friday at the HPC Site in Bridgwater.

The Role

Working in the Central Controls Teams as part of the Planning Discipline of Project Controls, under the direction and leadership of the IPC Planning Manager, to be responsible for the management of the Level 2/4 (client) Integrated Work Schedule (IWS) in adherence with HPC processes. This will include managing the alignment of Level 3 (contract) schedules, and provision of time-related data and analysis. To support the IPC Planning Manager in leading central Planning activities for the Project and in developing Planning standards, policies and strategies. To support EDF Energy in making informed decisions to support the efficient and timely delivery of work scope.

Responsibilities

  • Support the IPC Lead Planner in the implementation and maintenance of Project Controls processes for Planning.
  • Support Senior Project/ Programme Managers including the production of monthly reports, through the provision of intelligent information and analysis.
  • Collaborate with other Disciplines of Integrated Project Controls, as well as other Project Support Functions, to help deliver Project goals in keeping with the HPC principles of Trust, Transparency and Teamwork.
  • Produce and maintain the schedule baseline IWS in Primavera 6 (P6), with fully logic-linked work plans aligned to the Work Breakdown Structures (WBS) and utilising approved construction techniques.
  • Ensure the Level 2/4 IWS is updated to an agreed timeframe.
  • Assist in the Trend & Change process, including analysis at Project level, generating performance indicators and providing feedback on areas of risk and opportunities.
  • Identify, analyse and provide solutions to time-related issues.
  • Co-ordinate, verify and produce Project-level schedule reports to a defined reporting cycle, including commentary on key time-related drivers and performance issues.
  • Adhere to Project governance and Scheduling standards and procedures.
  • Ensure all Project documents, in particular Sensitive Nuclear Information, are correctly protectively marked, and protected in accordance with EDF policies and procedures.

Qualifications

Expected:

  • Minimum of a degree in Engineering, Construction or other related field, or HND or equivalent qualification with recognised experience commensurate with a degree.
  • Professionally qualified with chartered or equivalent status.
  • Proven relevant experience in a Project Management or Project Controls environment in a similar Scheduling role on a major construction project.
  • Substantial experience in the use of scheduling software, ideally Primavera P6 version 7 and above.
  • Experience of commercial contracting.
  • Detailed understanding of scheduling methodologies and techniques.
  • Technical and practical comprehension of engineering, procurement and construction methods and techniques in a UK context.
  • Ability to produce accurate, complete and fully logic-linked construction plans.
  • Understanding of other Disciplines of Project Controls (particularly Estimating, Cost and Risk) including management techniques and associated software.
  • Understanding of earned value analysis.
  • Understanding of various contract types, in particular the NEC suite and FIDIC.
  • Working knowledge of schedule risk analysis techniques.
  • High level of analytical and numerical skills and good attention to detail.
  • Excellent written and verbal communication skills at all working and management levels.

The job-holder will be expected to have a working level of knowledge of, and to use, the following (or similar equivalent) software tools:

  • Acumen Fuse (Schedule Analysis).
  • Microsoft Office software (Excel, Word, PowerPoint, Access).
  • Teamcenter (Document Control).

About Us

Wood is a global leader in consulting, engineering and operations for the energy and materials sectors. With 33,000 people in around 50 countries, Wood supports clients across the full asset lifecycle, delivering safe, predictable outcomes while enabling resilient operations and a lower carbon future.

Diversity Statement

We are an equal opportunity employer that recognises the value of a diverse workforce. All suitably qualified applicants will receive consideration for employment on the basis of objective criteria and without regard to race, colour, age, religion, gender, national origin, disability, sexual orientation, gender identity, protected veteran status, or other characteristics in accordance with the relevant governing laws.

IPC Commissioning Planning Engineer - Nuclear in Bridgwater employer: John Wood Group PLC

John Wood Group PLC is an exceptional employer, offering a dynamic work environment where innovation meets collaboration. With a strong focus on employee growth and development, you will have access to ongoing training and career advancement opportunities while working on impactful projects in the pharmaceutical sector. Located in a vibrant area, the company fosters a culture of teamwork and inclusivity, making it a rewarding place to build your career.

John Wood Group PLC

Contact Details:

John Wood Group PLC Recruitment Team

StudySmarter Expert Advice🤫

We think this is how you could land IPC Commissioning Planning Engineer - Nuclear in Bridgwater

✨Join Construction Networks

Get yourself involved in local construction networks or industry events. They often have job boards, and networking can lead to unadvertised positions. Plus, it’s a great way to meet potential future colleagues!

✨Show Off Your Skills on Site

If you’ve done any hands-on work, whether it's through internships or personal projects, make sure you can showcase it. Consider volunteering for local construction projects or getting involved in community build days; it’s a solid way to demonstrate your skills and build connections.

✨Utilise Construction Job Sites

Don't just rely on the big job boards. Look at niche construction job sites—many companies prioritise these for full-time roles. Apply through these sites, but don’t forget to reach out directly to companies you admire, like John Wood Group PLC, to express your interest!

✨Tailor Your Application for Full-Time Roles

Make your application stand out by tailoring it specifically for full-time positions. Highlight how your previous projects align with the company's work. At StudySmarter, we encourage you to demonstrate your commitment and long-term interest in the industry when applying for roles like IPC Commissioning Planning Engineer - Nuclear at John Wood Group PLC.

We think you need these skills to ace IPC Commissioning Planning Engineer - Nuclear in Bridgwater

Project Controls
Integrated Work Schedule (IWS)
Primavera P6
Scheduling Methodologies
Analytical Skills
Attention to Detail
Communication Skills

Some tips for your application 🫡

Showcase Your Relevant Experience:In the construction industry, it's essential to highlight any hands-on experience you have. Whether it’s past projects you've worked on or specific roles you've held, make sure your CV emphasises your practical skills and contributions to construction sites.

Include Certifications and Qualifications:Don’t forget to list any certifications relevant to construction, like CSCS cards or other safety qualifications. These can really set you apart from other candidates and show that you’re serious about health and safety on-site.

Tailor Your Cover Letter to Construction:When writing your cover letter for a construction role, focus on your problem-solving capabilities and teamwork. Construction relies heavily on collaboration, so mention how you’ve worked successfully with others to complete projects on time and within budget.

Adapt Your CV Format to the Field:Ensure your CV is clear and easy to read, with sections dedicated to skills such as project management, technical abilities, and site supervision. Construction roles often require a blend of technical know-how and soft skills, so make sure both are highlighted effectively.

How to prepare for a job interview at John Wood Group PLC

✨Brush Up on Technical Knowledge

For a construction role, it's crucial we have a solid grasp of industry standards, safety protocols, and specific tools used on-site. Make sure you're familiar with relevant regulations and can talk confidently about them, as these often come up in interviews.

✨Showcase Your Projects

Since this is a full-time position, be ready to discuss any previous construction projects you've worked on. Bring a portfolio or have detailed descriptions that highlight your role, the challenges you faced, and how you overcame them—this’ll show you’re not just book-smart but also practically savvy.

✨Understand the Team Dynamics

Construction is all about teamwork, so prepare to discuss how you interact with different stakeholders like architects, engineers, and contractors. Maybe think of examples from past experiences to illustrate your ability to communicate and collaborate effectively.

✨Prepare for On-the-Spot Problem Solving

Be ready for some practical questions or scenarios where you'll need to demonstrate your problem-solving skills. Interviewers might present you with a hypothetical construction issue to solve, so practice articulating your thought process clearly and logically—this could really set you apart!