At a Glance
- Tasks: Create and manage project schedules for innovative energy storage projects.
- Company: Bilfinger UK, a leader in engineering and maintenance across various industries.
- Benefits: Competitive salary, career growth, and a chance to work on groundbreaking projects.
- Other info: Opportunity to work on a first-of-a-kind energy storage facility in Greater Manchester.
- Why this job: Join a dynamic team and contribute to the UK's net-zero transition with cutting-edge technology.
- Qualifications: 8+ years in EPC environments, expert in Primavera P6, strong communication skills.
The predicted salary is between 75000 - 85000 £ per year.
Bilfinger UK is a leading engineering and maintenance provider, supporting customers across the chemical & petrochemical, nuclear, oil & gas, pharmaceuticals & biopharma, power & energy, utilities, renewables and food & beverage markets. We enhance the efficiency of assets, ensuring a high level of availability and reducing maintenance costs. We have extensive experience in offshore and onshore facilities; specialising in asset management services throughout all life cycle phases from consulting, engineering, manufacturing, assembly, operations, maintenance, and decommissioning.
Highview Power Carrington – LAES Project (FOAK) 50 MW / 300 MWh Liquid Air Energy Storage Facility | Greater Manchester is a first‑of‑a‑kind, commercial‑scale greenfield delivery of a 50 MW / 300 MWh Liquid Air Energy Storage (LAES) facility, supporting long‑duration energy storage and the UK’s net‑zero transition. The project utilises proprietary LAES technology, converting surplus renewable electricity into stored liquid air, with later pressurisation and reheating to drive turbines for electricity generation.
The Senior Planner is responsible for the creation and maintenance of all project schedules across the full lifecycle of the project, inclusive of all required supporting documentation, procedures and standards. These responsibilities range from liaising with the business development, engineering and project management teams to develop a fully cost and resource loaded schedule for tender / contractual submissions, through to the management of the periodic progress updates and submissions with all required reporting outputs.
Key Responsibilities- Development and management of all key scheduling processes and key documentation (inclusive of robust basis of schedule, WBS/OBS/CBS structures, Cost Accounts, activity coding structures).
- Development and management of all required fully cost and resource loaded Primavera P6 schedules as needed for the Project, inclusive of integrated master schedules, detailed construction schedules (level 4 / 5) and periodic lookahead schedules.
- Embedding schedule risk management best practices, ensuring that all schedules contain appropriate time risk allowances using Quantitative Schedule Risk Management Analysis (QSRA).
- Management of the alignment and interaction between the schedule, project cost estimate / cashflow and resource forecasting and utilisation.
- Establish effective change control management including the use of techniques such as critical path analysis and float erosion to provide early warning of potential issues.
- To establish and manage the periodic progress capture, schedule update and submission process and outputs in‑line with NEC4 requirements.
- Development and production of all required monthly reporting outputs (e.g. planned vs actual progress reporting / narrative, S‑Curves, manpower histograms).
- Work closely with the Project Controls Manager and commercial teams to establish cost engineering systems to monitor, control and report costs (inclusive of all Earned Value Management output requirements).
- Provide contract management support including development of bespoke and/or generic rules of credit, KPI development and monitoring, NEC programme acceptance management and production / assessment of compensation event impact schedules.
- Liaise with PMs/RDs to manage the provision of appropriate resources and expertise to successfully deliver the project control activities.
- Support the wider business with the identification and adoption of project controls best practices.
- Minimum of 8 years’ experience in an EPC environment.
- NEC3/4 qualification and/or significant experience.
- Expert level capability in the use of Primavera P6 planning software.
- Capability in Microsoft 365 applications (MS Office, teams, etc.).
- Strong communication skills both verbal and written, plus strong analytical skills.
- BSc / BEng / MSc in Engineering, Construction Project Management or relevant subject.
- APM, AcostE or APE membership and/or qualification.
- Certified Oracle P6 Training (P102 & P106).
- Power BI, Power Platform and SAP experience.
Senior Planner - HVP in Carrington employer: Bilfinger UK
Bilfinger UK is an exceptional employer, offering a dynamic work environment that fosters innovation and collaboration within the engineering and maintenance sector. With a strong commitment to employee development, we provide extensive training opportunities and support for career progression, all while working on groundbreaking projects like the Highview Power Carrington LAES facility in Greater Manchester. Our culture prioritises safety, quality, and teamwork, making it a rewarding place for professionals seeking to make a meaningful impact in the energy transition.
StudySmarter Expert Advice🤫
We think this is how you could land Senior Planner - HVP in Carrington
✨Join Construction Networks
Get yourself involved in local construction networks or industry events. They often have job boards, and networking can lead to unadvertised positions. Plus, it’s a great way to meet potential future colleagues!
✨Show Off Your Skills on Site
If you’ve done any hands-on work, whether it's through internships or personal projects, make sure you can showcase it. Consider volunteering for local construction projects or getting involved in community build days; it’s a solid way to demonstrate your skills and build connections.
✨Utilise Construction Job Sites
Don't just rely on the big job boards. Look at niche construction job sites—many companies prioritise these for full-time roles. Apply through these sites, but don’t forget to reach out directly to companies you admire, like Bilfinger UK, to express your interest!
✨Tailor Your Application for Full-Time Roles
Make your application stand out by tailoring it specifically for full-time positions. Highlight how your previous projects align with the company's work. At StudySmarter, we encourage you to demonstrate your commitment and long-term interest in the industry when applying for roles like Senior Planner - HVP at Bilfinger UK.
We think you need these skills to ace Senior Planner - HVP in Carrington
Some tips for your application 🫡
Showcase Your Relevant Experience:In the construction industry, it's essential to highlight any hands-on experience you have. Whether it’s past projects you've worked on or specific roles you've held, make sure your CV emphasises your practical skills and contributions to construction sites.
Include Certifications and Qualifications:Don’t forget to list any certifications relevant to construction, like CSCS cards or other safety qualifications. These can really set you apart from other candidates and show that you’re serious about health and safety on-site.
Tailor Your Cover Letter to Construction:When writing your cover letter for a construction role, focus on your problem-solving capabilities and teamwork. Construction relies heavily on collaboration, so mention how you’ve worked successfully with others to complete projects on time and within budget.
Adapt Your CV Format to the Field:Ensure your CV is clear and easy to read, with sections dedicated to skills such as project management, technical abilities, and site supervision. Construction roles often require a blend of technical know-how and soft skills, so make sure both are highlighted effectively.
How to prepare for a job interview at Bilfinger UK
✨Brush Up on Technical Knowledge
For a construction role, it's crucial we have a solid grasp of industry standards, safety protocols, and specific tools used on-site. Make sure you're familiar with relevant regulations and can talk confidently about them, as these often come up in interviews.
✨Showcase Your Projects
Since this is a full-time position, be ready to discuss any previous construction projects you've worked on. Bring a portfolio or have detailed descriptions that highlight your role, the challenges you faced, and how you overcame them—this’ll show you’re not just book-smart but also practically savvy.
✨Understand the Team Dynamics
Construction is all about teamwork, so prepare to discuss how you interact with different stakeholders like architects, engineers, and contractors. Maybe think of examples from past experiences to illustrate your ability to communicate and collaborate effectively.
✨Prepare for On-the-Spot Problem Solving
Be ready for some practical questions or scenarios where you'll need to demonstrate your problem-solving skills. Interviewers might present you with a hypothetical construction issue to solve, so practice articulating your thought process clearly and logically—this could really set you apart!