Design Coordinator – Data Centre Construction in Taunton

Design Coordinator – Data Centre Construction in Taunton

Taunton Full-Time On-site
4

Bristol | £45,000–£50,000 | Permanent

Enjoy keeping construction projects organised and making sure everything runs smoothly?

We're recruiting for an established specialist contractor delivering complex construction projects across the data centre, defence and energy sectors.

You’ll initially join the team working on Phase 2 of a data centre refurbishment and expansion in Bristol, increasing IT capacity by 2.4MW with new electrical and mechanical infrastructure.

This is a great opportunity for an experienced Design Coordinator who enjoys working with different teams, keeping information flowing and making sure projects stay on track.

What will you be doing?

Working closely with the Design Manager, engineers, consultants and subcontractors, you’ll help coordinate design information throughout the project.

Your Responsibilities Will Include

  • Coordinating drawings, design submissions, reviews and approvals.
  • Maintaining design registers, trackers and outstanding actions.
  • Monitoring deadlines and following up information to keep the programme moving.
  • Supporting design meetings and coordinating information between project teams.
  • Identifying missing information or potential delays before they become problems.
  • Supporting design documentation through to project handover.

What we're looking for

You’ll have experience in construction, engineering or design coordination and understand how design information moves through a project.

Ideally, You’ll Bring

  • Experience coordinating construction drawings, design information and project documentation.
  • Good organisational skills and the confidence to follow up with consultants and subcontractors.
  • An understanding of construction design processes and project deadlines.
  • Experience using Common Data Environments (CDEs) or similar project systems would be beneficial.

You don't need to be an engineer or a Design Manager. We're looking for someone who enjoys the detail, communicates well and takes pride in keeping everything organised.

What's on offer?

£45,000–£50,000 salary

  • 25 days' holiday plus bank holidays and your birthday off
  • BUPA healthcare and cash plan
  • Competitive pension scheme
  • Car allowance for eligible roles
  • Electric vehicle and cycle-to-work schemes
  • Eyecare vouchers

Design Coordinator – Data Centre Construction in Taunton employer: 4Front Recruitment

Join a dynamic and growing design, construction, and engineering contractor in Acton, West London, where you will have the opportunity to take ownership of information management on major hyperscale data centre projects. With a strong focus on employee growth, our supportive work culture encourages mentorship and collaboration, while offering competitive benefits such as a car allowance, healthcare, and flexible working arrangements. This role not only allows you to lead Document Control operations but also provides a platform for professional development in a technically complex and rewarding environment.

4

Contact Details:

4Front Recruitment Recruitment Team

StudySmarter Expert Advice 🤫

We think this is how you could land Design Coordinator – Data Centre Construction in Taunton

✨Join Local Manufacturing Groups

Getting involved in local manufacturing groups or associations can seriously boost your visibility. These groups often have insider info on job openings and networking events, plus they help you connect with like-minded folks in the industry. Check out what's happening in your area!

✨Show Off Your Skills in Practical Spaces

Consider participating in workshops or open days at manufacturing companies. It's a great way to show off your hands-on skills in a real-world environment and can sometimes lead to job offers right on the spot. Keep an eye on announcements from local manufacturers for these opportunities!

✨Leverage the Power of Internships

While you're looking for full-time positions, don't underestimate the power of internships! Even if you don't see a direct role, securing an internship at a company can open doors to future jobs. Many manufacturing firms prefer to hire from their intern pool, so it's definitely worth considering.

✨Apply Directly Through Company Websites

When you find a role at a company you love, like 4Front Recruitment, apply directly on their website. This way, you’re more likely to be noticed by the hiring team. Plus, showing that you took the time to seek out their application process highlights your genuine interest in the firm!

Some tips for your application 🫡

Showcase Your Technical Skills: In the manufacturing-production sector, it's crucial to highlight your technical skills and experience. Make sure your CV features any relevant qualifications, such as certifications in machinery operation or production management, and don’t forget about any specific systems or software you’re familiar with. This can really set you apart!

Emphasise Teamwork and Communication: Working in manufacturing often means being part of a larger team. Highlight your experience in collaborative projects or environments where communication was key. Maybe you have experience with lean manufacturing principles? Talk about how you worked with your team to improve productivity and maintain quality.

Tailor Your Cover Letter to the Company: Don’t just recycle an old cover letter! Take the time to tailor your cover letter to 4Front Recruitment specifically. Mention what excites you about their production processes or products, and how your previous experiences can contribute to their goals. We want to see your enthusiasm for the role!

Use Concrete Examples of Your Achievements: When detailing your work experience, include measurable achievements that can demonstrate your impact. Whether it’s improving efficiency by a certain percentage or successfully leading a project, these specifics can make a huge difference. Numbers speak volumes in the manufacturing world!

How to prepare for a job interview at 4Front Recruitment

✨Know Your Manufacturing Processes

Before you walk into the interview with 4Front Recruitment, brush up on the specific manufacturing processes relevant to the role. Understanding lean manufacturing principles or quality control techniques could give you a solid edge to discuss how you’d fit into their operations.

✨Technical Questions Are Key

Be prepared for technical questions around machinery, production scheduling, or materials handling. Make sure you can confidently explain how you've dealt with these in past experiences or internships. Knowing industry-specific software could also be a big plus!

✨Showcase Your Problem-Solving Skills

Manufacturing environments often focus on continuous improvement. Be ready to discuss specific instances where you’ve solved a production issue or implemented a process improvement. It’s all about demonstrating your analytical thinking and hands-on approach.

✨Align Your Values with Quality and Safety

In a full-time role, companies like 4Front Recruitment value commitment to quality and safety. Be prepared to discuss how you prioritise these factors in your work. It’s about showing that you’re not just looking for a job, but that you genuinely care about contributing positively to their production environment.